top of page

BIM-based Main Contractors in HK, ME, SG BIM

 

resources for extensive Employer' BIM requirements

No more hard works & late nights.
Just design.

2048-DSC08151-1.jpg

What we do.

  • EC Modeling

  • As-built BIM Modeling

  • FM BIM Data Integration

  • Clash Analysis, 4D/5D

MCM-HAI-DI-LAO.png

Work with us.

Resource-based

We manage & coordinate & integrate cost data until the end of Construction stage

3.2B VND

✓  BIM Lead BIM Clash

✓  Coordination BIM Modeling

✓  Management @ LOD 300 BIM

✓  Cost Data Integration

BIM Uses we will implement:

- Design Authoring

- Design Coordination

- Cost Estimation

Duration: for these stages below only 1-Concept Design: 60 days

2-Basic Design: 45 days

3-Technical Design: 30 days

4&5-Tender & Construction Design: 45 days

6-Construction: 480 days

Lump sum

We manage & coordinate & integrate cost data until the end of Construction Design stage

1.2B VND

✓  BIM Lead BIM Clash

✓  Coordination BIM Modeling ✓ Management @ LOD 300 BIM

✓ Cost Data Integration

BIM Uses we will implement:

- Design Authoring

- Design Coordination

- Cost Estimation

Duration: for these stages below only 1-Concept Design: 60 days

2-Basic Design: 45 days

3-Technical Design: 30 days

4&5-Tender & Construction Design: 45 days

6-Construction: 480 days

Revenue sharing

We manage & coordinate
until the end of Construction Design stage

750M VND

✓  BIM Lead BIM Clash 

✓  Coordination BIM Modeling

✓  Management @ LOD 300 BIM

✓  Cost Data Integration

BIM Uses we will implement:

- Design Authoring

- Design Coordination

Duration: for these stages below only 1-Concept Design: 60 days

2-Basic Design: 45 days

3-Technical Design: 30 days

4&5-Tender & Construction Design: 45 days

6-Construction: 480 days

Some of our featured works.

bottom of page