BIM the right way.

I"Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum."

What we do.

  • Project BIM Lead

  • Project BIM Coordination

  • Project BIM Model/ Modeling Management

  • BIM Time & Cost Data Integration & Analysis

MCM-HAI-DI-LAO.png

Work with us.

Resource-based

We manage & coordinate & integrate cost data until the end of Construction stage

3.2B VND

✓  BIM Lead BIM Clash

✓  Coordination BIM Modeling

✓  Management @ LOD 300 BIM

✓  Cost Data Integration

BIM Uses we will implement:

- Design Authoring

- Design Coordination

- Cost Estimation

Duration: for these stages below only 1-Concept Design: 60 days

2-Basic Design: 45 days

3-Technical Design: 30 days

4&5-Tender & Construction Design: 45 days

6-Construction: 480 days

Lump sum

We manage & coordinate & integrate cost data until the end of Construction Design stage

1.2B VND

✓  BIM Lead BIM Clash

✓  Coordination BIM Modeling ✓ Management @ LOD 300 BIM

✓ Cost Data Integration

BIM Uses we will implement:

- Design Authoring

- Design Coordination

- Cost Estimation

Duration: for these stages below only 1-Concept Design: 60 days

2-Basic Design: 45 days

3-Technical Design: 30 days

4&5-Tender & Construction Design: 45 days

6-Construction: 480 days

Revenue sharing

We manage & coordinate
until the end of Construction Design stage

750M VND

✓  BIM Lead BIM Clash 

✓  Coordination BIM Modeling

✓  Management @ LOD 300 BIM

✓  Cost Data Integration

BIM Uses we will implement:

- Design Authoring

- Design Coordination

Duration: for these stages below only 1-Concept Design: 60 days

2-Basic Design: 45 days

3-Technical Design: 30 days

4&5-Tender & Construction Design: 45 days

6-Construction: 480 days