top of page

We are 
BIM Projects

Specialists.

DSC07864.jpg

What is our BIM projects team?

This the core group in our company. Comprise of BIM Production and Implementation team of 40+ architects, engineers, and BIM experts who love building BIM 3D models for all types of BIM uses. 

All we do on the BIM Projects Team is build models, coordinate various disciplines, and manage everything involving BIM. 

Our typical BIM projects services.

+ BIM 3D Modeling

+ BIM Coordination

+ Clash Detection

+ BIM Documentation

+ Scan-to-BIM

+ BIM 5D Quantity Management

+ BIM Implementation

 

Want to find out how good we are? Send us an email and let us show you. 

Some of the BIM tools we've used.

  • SketchUp

  • Rhinoceros

  • Bently Systems

  • CATIA

  • AutoCAD

  • Revit

  • Navisworks

  • ArchiCAD

  • Tekla

  • Grasshopper

  • SketchUp

  • Rhinoceros

  • Bently Systems

  • CATIA

  • AutoCAD

  • Revit

  • Navisworks

  • ArchiCAD

  • Tekla

  • Grasshopper

Check out some of our selected BIM Projects work below. 

PMH_CR1-2_MEPF.jpg

Shopping Center.

Architectural | MEPF | Structural BIM modeling.

 

In addition to BIM Management work on this project, we were also responsible for the creation of the BIM models for all disciplines for the purpose of coordination during the construction phase.  

 

An expansion to existing development, this shopping center was very challenging for us since the old phase was not done in BIM. We had to start from scratch and coordinate with all the existing conditions of the project. 

 

We were able to accomplish this project in record time and save our clients significant costs during the construction phase.

 

This project was recently completed in early 2018. 

Fabrication Modeling.

Architectural | MEPF | Structural design modeling.

 

Our project team of Architectural, Structural, and MEPF modelers created over 350 cut-sheets of the different components and assemblies for the 12-unit building consisting of 3 floors and almost 1,000 square meters of floor area for one of the most innovative and technological-driven integrated design and construction company in the United States. 

This project was completed in 2019. 

P17103-MCM-XX-ZZ-M3-A-AddisonLee_quang2.

Technology Office.

Interior design modeling.

Located in Spain, the design for this innovative technology office came from an award-winning design firm based out of London. 

Our team was in charge of creating the documentation and modeling for the interior design. We generated a full set of design documents for the designer and provided assurance to the consultant teams to complete the proper coordination of the project. 

The project was recently completed in early 2018.  

Residential Complex.

Architectural design modeling.

Located in District 4, Ho Chi Minh City, The Lancaster Lincoln has over 72,000 square meters of floor area with two towers overlooking District 1. Our team is responsible for the accurateness and completeness of the architectural models and coordination of all the trades.

 

We are the official BIM consultant for this project as well as the BIM modeler and coordinator. Once completed, this truly is the first fully implemented BIM building of its kind from the design stage all the way to the construction.

Associate Housing.

Architectural design modeling.

Located in Vietnam, the design for the associate housing​ was modeled in ARCHICAD utilizing our very own Integrated Design Process which incorporated Grasshopper, Rhinoceros, and ARCHICAD in a streamlined process. 

Our team not only got to model the overall building, but also the individual modules and components that make up the entire. 

Office Building.

BCA submission modeling.

Located in Singapore, this project with over 24,000 square meters of floor area was completed in 10 days with a team of 2 modelers. We were responsible for the architectural modeling and documentation preparation for BCA's formal BP submission stage. 

The hardest part of this work was the documentation's requirements from the architect as well as the building authority. 

The project was completed in 2015.

Mix-used Building.

BCA submission modeling.

 

Located in Singapore, this project with over 55,000 square meters of floor area was completed in 15 days with a team of 3 modelers. We were responsible for the architectural modeling and documentation preparation for BCA's formal BP submission stage. 

 

The most difficult part of this modeling process for this particular building was the coordination of the structural design and architectural elements. 

 

The project was completed in 2016.

QS Modeling.

Architectural & MEPF modeling.

One of the biggest developments in Ho Chi Minh City, Vinhomes Central Park comprise of over 10,000 apartment units spreading over 17 towers including an impressive 81 level office tower called the Landmark.

We were responsible for the completion of the architectural, mechanical, electrical, plumbing, and fire protection model of the first phase of the project. The purpose of this project was to have a BIM model that can verify the quantity and accuracy of the design and construction. 

Working with Meinhardt Vietnam, we created many customized elements and components for this project. The most difficult part of this work was the tight schedule and the coordination of the trades.

Our modeling work was completed in 2015.

bottom of page